Disconnect from a Public Sewer1. File an Application:
a. You must first file an “Application to Disconnect from Public Sewer System” with the Municipal Engineer. Fax: (902) 667-1352 (Attn: Director of Public Works); Mail: Director of Public Works, 1395 Blair Lake Rd, RR 6, Amherst, NS, B4H 3Y4; Shipping: E.D. Fullerton Municipal Building, 1395 Blair Lake Rd, RR 6, Amherst, NS, B4H 3Y4 1. Where a building has been removed from the property: a. The owner must obtain a demolition permit from the Municipality and complete the demolition. The building service connection must then be excavated to a minimum depth of 300 mm being 1.2 m outside the foundation wall and capped using a gasketed, water tight cap approved by the engineer. b. Once the building service connection is capped but prior to backfilling call (902) 667-3029 to arrange for inspection (please note sewer charges will not be reduced if an inspection has not been completed); there is no charge for this inspection. c. The work can be bedded in Type I gravel and backfilled upon written notice of the Engineer. 2. Where the building is being converted to a storage building or other proposed usage not requiring sewer service: a. The owner must obtain approval for the change in usage including a development permit from the Municipality, b. remove all plumbing fixtures and waste piping from the building; and c. follow the procedure set out in section (1) above for disconnection of the building service connection a minimum 1.2 meters outside the foundation of the building. |